BASE HEADER

Other

Preferred Options 2025

ID sylw: 95259

Derbyniwyd: 04/03/2025

Ymatebydd: David Gosling

Crynodeb o'r Gynrychiolaeth:

The ability for a developer to claim reason to not include MUGA or other play areas should be set as a very high bar. Paying an “off-site sum” merely shifts the obligation onto someone else to find the necessary space when such space is unlikely to be available near to the point of need or at a cost which the off-site sum will cover