The road infrastructure in and around Warwick is already at maximum capacity at peak times, the A46 Warwick bye pass is regularly(several times a week) congested going south to the M40 junction 15 in the morning peak time and equally travelling north from the M40 junction onto the bye pass in the evening. In the event of a breakdown or collision the adjoining roads are blocked for hours at a time. Further development on major and adjoining routes to these bye pass, roads into Warwick and onto the M40 will result in severe congestion and pollution.