The priority has to be for renewal energy to take precedence over history. It is right to ensure our history is protected but not al the total exclusion of renewals. Local planning officers must become more receptive to allowing renewable energy solution on both historic buildings and those buildings in conservation areas.

The plan should work to better support residents in transferring to renewal energy. I have funded my own solar panels and battery. The cost of installing a air source heat pump owing to having to replace all the radiators and piping (£30,000 has been quoted).