BASE HEADER
Yes
Preferred Options 2025
ID sylw: 87242
Derbyniwyd: 07/02/2025
Ymatebydd: Mr Christopher Howarth
Crynodeb o'r Gynrychiolaeth:
Agree with policy to prioritise building on low risk areas as it is devastating when flooding occurs. However, I feel there should be investigations into developments where the potential could be to cause extra capacity issues further downstream or within urban areas where the capacity of existing draining is overrun