Crynodeb o'r Gynrychiolaeth:

The policies set out for development in flood risk areas do not adequately address the issue of flood risk taking into account the increased frequency of 1:100 etc events. A more stringent measure should be adopted and finished floor levels should be at least 800mm above the annual probability and appropriate mitigation such as provision for flood barriers, permeable surfacing, back draft valves etc put in place.

I support the statement all new development should not detrimentally impact on existing and planned flood risk management schemes.