BASE HEADER
Yes
Preferred Options 2025
ID sylw: 100987
Derbyniwyd: 07/03/2025
Ymatebydd: Rowington Landowner Consortium
Asiant : Knight Frank LLP
Crynodeb o'r Gynrychiolaeth:
Draft Policy J – Reducing Flood Risk aligns with the NPPF 2024, promoting a sequential approach to direct development away from high-risk flood zones. At site C1, development is largely located in Flood Zone 1 with some areas with a higher risk of surface water flooding, whereby higher-risk areas would likely be designated for open spaces and water management features, in line with the policy. The proposals would seek to incorporate Sustainable Drainage Systems (SuDS) to manage surface water runoff, ensuring flood risk is mitigated and the development remains sustainable and resilient.