Issue and Options 2023

Search form responses

Results for Bloor Homes Western search

New search New search
Form ID: 77933
Respondent: Bloor Homes Western
Agent: Marrons

No

Bloor Homes consider that the proposed Vision is appropriate in general terms. However, the proposed Vision makes reference to meeting unmet need from neighbouring authorities, and Bloor Homes consider it would be more appropriate to reference meeting unmet need from the wider Housing Market Areas. Whilst Birmingham and the Black Country authorities are not neighbouring authorities of South Warwickshire, they do form part of the same Housing Market Area and therefore should not be excluded.

Form ID: 77934
Respondent: Bloor Homes Western
Agent: Marrons

The following comments are made in respect of the SA for Stratford-upon-Avon. As a general point, the fact that a Broad Location may not be the best performing location does not automatically mean that within that Broad Location there are no suitable sites that should not come forward as a strategic allocation. The Councils will need to be mindful that this is only one piece of evidence at a strategic level, and the HELAA and other evidence will need to inform the selection of allocations. The Site promoted by Bloor Homes (Site 382) forms part of Stratford-upon-Avon South (Broad Location 28), but also includes a small parcel of land to the south of the area. In assessing the five Broad Locations (BL) identified against the SA Objectives, the SA concludes that Stratford-upon-Avon East is the least constrained in terms of environmental receptors. However, Stratford-upon-Avon East is not considered developable without significant highway infrastructure improvements, as its only highway connection to the strategic road network is via the Clopton Bridge and the town centre. In the absence of any evidence to demonstrate this BL would be developable in transport terms, it is not therefore a ‘reasonable alternative’ for up to 2,000 homes, and therefore should not be carried forward in the SA process. If such evidence can demonstrate it is developable, the highway infrastructure essential to the delivery of this BL must form part of the SA and therefore this BL will need to be re-assessed in the next iteration. It is also noted that a large part of Stratford-upon-Avon East is a golf course that has not been submitted through the call for sites. If a large proportion of the land is not available, this is not a ‘reasonable alternative’. The following specific comments are made in relation to the SA and Stratford-upon-Avon South. SA Objective 2: Flood Risk acknowledges that only very small proportions of the area coincide with Flood Zone 3, and therefore there is negligible impact. All BLs perform arguably equally, and should be assessed as such. It is noted for SA Objective 4: Landscape that additional surveys are required to understand latest sensitivity qualities at each BL. This is welcomed as an updated assessment is required, particularly in respect of Stratford-upon-Avon South given the ongoing and completed development of older peoples accommodation at Land south of the Rosebird Centre. These developments, along with the south-western relief road (LMA) to the west once built, will significantly change the landscape character of the southern part of this BL. It is worth remembering that paragraph 73. a) of the National Planning Policy Framework (NPPF) requires Councils to consider the opportunities presented by existing or planned investment in infrastructure when deciding the location of new development. The SA should therefore take into account the development south of Rosebird Centre and the planned south-western relief road. SA Objective 5: Cultural Heritage and paragraph 4.14.14 incorrectly states that Stratford-upon-Avon South is in close proximity to a Grade I Listed building. This should be amended in the next iteration of the SA. The Heritage and Settlement Sensitivity Assessment has assessed this site as part of the South-east area which scores Green. Further, the Heritage Evidence supporting the Site Allocations Plan finds no heritage constraints on the land east of Shipston Road. Stratford-upon-Avon South performs arguably equally with NorthWest, and should be assessed as such in the next iteration of the SA. SA Objective 11: Accessibility and paragraph 4.14.31 is inconsistent with the text in table B.28.11 for Stratford-upon-Avon South. Stratford-upon-Avon South performs equally with Northeast, and should be assessed as such in the next iteration of the SA. Further, with regard to SA Objective 13: Economy, Stratford-upon-Avon South falls within the sustainable target distance for employment, and therefore performs equal best. Stratford-upon-Avon South performs better than has been recorded in this SA, and this should be recognised in the next iteration of the SA. Further, there are parts of the BL that do not result in any negative impacts against the Objectives.

Form ID: 77935
Respondent: Bloor Homes Western
Agent: Marrons

selected

selected

selected

Form ID: 77937
Respondent: Bloor Homes Western
Agent: Marrons

The production of an Urban Capacity Study (UCS, October 2022) to support identification of brownfield land to help deliver the growth needs of South Warwickshire is in accordance with the NPPF. The following points are made in relation to how the UCS considers housing supply in the urban areas. However, it should be noted that the UCS also discusses the SWLP housing requirement and representations are made on those points under Q-H1-1 & 2. In relation to housing allocations from the adopted Local Plans, Bloor Homes consider that a comprehensive review of all outstanding allocations without planning permission is required to ensure that such sites still meet the definition of developable as set out in the NPPF. In particular, evidence will be required to demonstrate why the UCS suggests the capacity of some of the allocations will increase beyond what is included within the adopted Local Plan. That review and evidence must be published prior to the next iteration of the Plan to demonstrate the capacity from the allocations can be relied upon to meet the housing need. The UCS also includes within the supply 795 dwellings on sites which have been submitted to the SWLP Call for Sites process in the urban areas, and are considered to be potentially suitable. As no formal assessment of these submissions has taken place, their inclusion will need to be reviewed once the Housing and Economic Land Availability Assessment (HELAA) is published. Any allowance for such sites must be deducted from the windfall allowance. The UCS identifies an additional five sites on vacant land in the urban areas which have not yet been submitted to the Call for Sites process, but are considered potentially suitable for 328 dwellings. There is no certainty around the availability and deliverability of these sites to include them at this stage. Further, on assessment of these sites there are some serious concerns around their suitability in any case. The UCS also identifies two additional sites on brownfield land within the urban areas, at Talisman Square, Kenilworth (65 dwellings) and Westgate House, Warwick (39 dwellings). As above, these sites have not yet been submitted to the Call for Sites process and so there is no certainty around delivery. Finally, the UCS includes an assessment of the potential windfall supply with reference to the level of windfall delivery across South Warwickshire in the period 2011/12 to 2020/21. However, it is considered that this assessment is limited as it does not detail the sources of windfall supply, nor consider how the planning policy landscape in South Warwickshire may impact future windfall delivery. Whilst a windfall allowance is likely to be acceptable in principle in the SWLP, it should be calculated on the basis of compelling evidence as required by the NPPF.

Form ID: 77938
Respondent: Bloor Homes Western
Agent: Marrons

Yes

No answer given

Form ID: 77939
Respondent: Bloor Homes Western
Agent: Marrons

Nothing chosen

Bloor Homes site east of Shipston Road (Site 382) was not assessed within the Settlement Analysis Report. It is not clear why this land has not been assessed as it adjoins the built-up area boundary, and it is proposed in part for allocation as part of the emerging Site Allocations Plan. It is requested this is addressed in any update of the assessment. This site is well connected as evident by the proposed allocation of the north west element in Stratford-on-Avon District Council’s emerging Site Allocations Plan for a mixed use (housing and employment) development. Active and sustainable travel linkages exist along Shipston Road and the Tramway into the town centre from the site, and local facilities are within 800m of the site. This is therefore inherently a suitable location to accommodate growth, both the land proposed to be allocated within the Site Allocations Plan and the remaining adjoining area of land.

Form ID: 77940
Respondent: Bloor Homes Western
Agent: Marrons

Appropriate strategy

Appropriate strategy

Appropriate strategy

Appropriate strategy

Appropriate strategy

Form ID: 77942
Respondent: Bloor Homes Western
Agent: Marrons

selected

selected

selected

selected

Form ID: 77947
Respondent: Bloor Homes Western
Agent: Marrons

No

Yes, the HEDNA provides a reasonable basis for identifying future levels of housing need across South Warwickshire. However, Bloor Homes reserve its position in respect of whether this approach is reasonable for other authorities in Coventry and Warwickshire. The NPPF sets out that “to determine the minimum number of homes needed, strategic policies should be informed by a local housing need assessment, conducted using the Standard Method in national planning guidance – unless exceptional circumstances justify an alternative approach which also reflects current and future demographic trends and market signals” . National policy is therefore supportive of the approach that South Warwickshire Councils are seeking to implement, and as such utilising the HEDNA to inform the local housing need for South Warwickshire is supported. It is important, however, to remember that the local housing need is not the same as the housing requirement within the Plan. The UCS suggests that the SWLP housing need equates to 30,750 dwellings, however this figure does not reflect the latest evidence within the HEDNA and needs updating. In addition, the UCS assumes a Plan period which commences in 2025, however this does not align with the base date of the HEDNA and as such a Plan period from 2022 is considered more appropriate to align with the evidence base. On the basis of the above, we consider a more appropriate local housing need for the SWLP is 47,012 dwellings over a 28 year plan period. In line with the NPPF , it is considered that this figure represents the minimum number of homes needed, and that the Councils should consider whether it is appropriate to set a higher housing requirement in line with national guidance ; for example in order to address a significant affordable housing shortfall, support economic development, or address strategic infrastructure requirements which are likely to increase the number of homes needed. Further consideration will also need to be given to unmet needs within the Housing Market Area in line with the Duty to Cooperate and the positively prepared test of soundness , which is explored in further detail in response to Issue H4 below. Bringing together comments on the UCS and Unmet Needs under Q-H4.2, Bloor Homes consider that the SWLP will need to plan for a level of housing growth in the order of at least 43,000 dwellings.

Form ID: 77950
Respondent: Bloor Homes Western
Agent: Marrons

Nothing chosen

It is imperative that that SWLP adequately considers accommodating unmet housing needs which are arising from outside of South Warwickshire, to ensure compliance with the Duty to Cooperate and so the SWLP can demonstrate adherence with the positively prepared test of soundness set out in the NPPF . It is recognised that national planning policy and law has the potential to change during the course of the preparation of the SWLP, including in relation to the Duty to Cooperate and replacement with an ‘alignment policy’, however there is no suggestion the requirement for local authorities to address unmet needs arising from within their Housing Market Areas will be removed. We consider that there are two likely sources of unmet housing needs which require consideration in the development of the SWLP: Birmingham and Black Country and Coventry and Warwickshire. Birmingham and Black Country There are clearly significant unmet housing needs arising from the Birmingham and Black Country Housing Market Area which require addressing by this Plan. Birmingham published a New Local Plan Issues and Options consultation document in October 2022. This identifies an overall housing need in Birmingham to 2042 (derived from the Standard Method) of some 149,286 dwellings, with total housing supply equating to just 70,871 – leaving a shortfall of some 78,415 dwellings. There are significant limitations to the potential for such substantial unmet needs to be met by Birmingham’s neighbouring authorities due to lack of available land in the Black Country and significant Green Belt coverage in the Black Country and elsewhere (Bromsgrove, Solihull, North Warwickshire, and Lichfield). This was evident in the work undertaken in the now abandoned Black Country Local Plan Review, which was subject to Regulation 18 consultation in 2021 and identified a shortfall in supply across the Black Country of some 28,239 dwellings to 2039. There are strong functional relationships between Birmingham and South Warwickshire, in terms of transport connections and commuting patterns, and development in South Warwickshire can contribute towards meeting unmet needs. The Councils clearly need to engage with Birmingham and the Black Country authorities and others to determine an appropriate level of unmet needs to be directed to South Warwickshire. That process needs to be transparent in accordance with paragraph 27 of the NPPF, and effective in accordance with paragraph 35 c) of the NPPF. The lack of any published Statement of Common Ground showing progress made so far by the Councils is a concern that needs to be addressed before the next round of consultation. The Councils need to properly grapple with this issue, and not allow the failings of the last round of Local Plans to be repeated. It is noted that the SA has tested the effects of an additional 5,000 to 10,000 dwellings to accommodate Birmingham’s unmet needs, however given the numbers discussed above Bloor Homes consider 5,000 dwellings to be at the lower end of what could be expected to be accommodated in South Warwickshire. At this stage of the process and in advance of those discussions, as a working assumption for the level of unmet need to be accommodated, the figure should be an additional 10,000 dwellings. Coventry and Warwickshire Although the question does not address Coventry’s unmet needs, this cannot be ignored. Coventry has by far the greatest level of housing need across Coventry and Warwickshire as set out in the HEDNA, with a housing need calculation derived from the Standard Method of some 3,188 dwellings per annum, adjusted in the HEDNA trend-based approach to 1,964 dwellings per annum. Applying the housing need calculated in the HEDNA to the proposed SWLP Plan period suggested from 2022 to 2050 equates to some 54,992 dwellings to be accommodated to meet Coventry’s needs, as a minimum. Coventry is highly constrained by a tightly drawn administrative boundary, with potential for brownfield redevelopment but limited opportunity for greenfield development. This was reflected in the adopted Coventry Local Plan (December 2017), where the local housing need in Coventry in the period 2011 to 2031 was calculated at 42,400. The Coventry Local Plan set a housing requirement of just 24,600 (some 60% of its local housing need), leaving a shortfall of some 17,800 dwellings to be met elsewhere. It is therefore highly unlikely that Coventry will be able to meet its local housing need identified in the HEDNA of 54,992 dwellings to 2050. Even assuming that Coventry can accommodate a proportion of its local housing need consistent with that set out in the adopted Coventry Local Plan (i.e. 60%), which is itself a challenge, Coventry could only accommodate 33,000 dwellings to 2050 leaving a shortfall of some 22,000 dwellings to be met elsewhere. Given South Warwickshire’s functional relationship with Coventry, and as South Warwickshire makes up around half of the population of Warwickshire according to the 2021 Census data early releases , an assumption that around 50% of this shortfall will be directed to South Warwickshire is considered appropriate. This equates to approximately 11,000 dwellings and should be taken into consideration at this stage of the process as a working assumption for the level of unmet need to be accommodated.

No answer given

For instructions on how to use the system and make comments, please see our help guide.