Showing comments and forms 91 to 120 of 288

No

Preferred Options 2025

Representation ID: 94691

Received: 03/03/2025

Respondent: Mr Bill Garrad

Representation Summary:

Inappropriate plan, this is green belt for a reason. Any scheme will impinge on Stratford town's already overstretched resources.

No

Preferred Options 2025

Representation ID: 94730

Received: 03/03/2025

Respondent: Miss Renny Wodynska

Representation Summary:

Already significantly over developed. Any proposals should be significantly scaled down and comply with AS9 in the core strategy and WW14 in Local Neighbourhood plan .

Other

Preferred Options 2025

Representation ID: 94757

Received: 03/03/2025

Respondent: Stratford-upon-Avon Town Transport Group

Representation Summary:

SG15/SG16 - Wellesbourne Group
While these are not considered as a new settlement, the potential agglomeration size means that they may function in a similar way. With no fast connectivity such as rail, and with buses providing the only viable public transport to Stratford-upon-Avon, the effects on traffic in the town and approaches would be untenable. TTG do not support these locations without a proper traffic assessment and planned infrastructure improvements in advance of development.

Yes

Preferred Options 2025

Representation ID: 94825

Received: 03/03/2025

Respondent: mr william tansey

Representation Summary:

Reasonable and not excessive expansion of the settlement if it is developed on its own, but it should not be used in conjunction with SG15

No

Preferred Options 2025

Representation ID: 95046

Received: 03/03/2025

Respondent: Luca Cenciotti

Representation Summary:

As a resident of Wellesbourne I am concerned that any new development will only come in the form of new houses and new industrial sites or warehouses. There is already a lack of educational and health facilities in Wellesbourne, with Primary School, GP and Dentist practice being oversubscribed. The roads connecting Wellesbourne with the M40 are already heavily congested and there seems to be no proposed infrastructures improvement in the plan. I am also concerned about the irreversible damage to the natural habitat and threat to local wildlife.

No

Preferred Options 2025

Representation ID: 95068

Received: 03/03/2025

Respondent: Dr Ruth Dixon

Representation Summary:

There has already been too much development in this area and without the right infra-structure being put in

No

Preferred Options 2025

Representation ID: 95174

Received: 04/03/2025

Respondent: Mr David Partridge

Representation Summary:

The local transport infrastructure around Wellesbourne is already under excess load - just try driving through town at any time near peak hours. There is effectively only one shop (Sainsbury's) in Wellesbourne which is barely adequate to meet requirements and as for things like education provision - show me the secondary schools ...

Furthermore there a very few employment opportunities in Wellesbourne which means that people will need to travel quite a distance to work - hardly in keeping with Climate Change Nett Zero policy3

No

Preferred Options 2025

Representation ID: 95206

Received: 25/02/2025

Respondent: Gareth Roberts

Representation Summary:

As residents of Wellesbourne we strongly object to including the Land East of Kineton Road (SG16) as a site for future housing development. Key points include:

Inadequate Infrastructure: Current services and infrastructure cannot support additional housing.
Heritage and Environment: Development would harm heritage assets, a recently discovered monument, and agricultural land.
Flooding and Congestion: Increased risk of flooding and traffic congestion.
Community Opposition: Nearly 500 objections from residents and organizations, including the Parish Council.
Unsustainable Development: Contradicts the National Planning Policy Framework (NPPF) and Core Strategy guidelines, impacting the environment, economy, and social well-being.

We urge the removal of this site from future development plans due to its unsuitability and the significant negative impacts on the community.

No

Preferred Options 2025

Representation ID: 95377

Received: 26/02/2025

Respondent: Linda Synge

Representation Summary:

I wish to object to the proposed developments around our villages. I live in Kineton but have strong links to Tanworth-in-Arden and Wellesbourne. While I've seen new housing benefit local shops and communities, these developments would transform our villages into towns without the necessary services. The increased traffic, especially in Kineton, would create significant issues at narrow junctions. Additionally, the Labour Party's manifesto promised housing on brownfield sites, yet these proposals target green fields, which would permanently damage the natural environment. I urge a reconsideration of land around existing towns for housing, as South Warwickshire's villages should remain distinct.

No

Preferred Options 2025

Representation ID: 95437

Received: 04/03/2025

Respondent: Mrs Hannah Molloy

Representation Summary:

Better that this is not Green Belt, I do not object to this site. Would prefer to see smaller plots around this area and neighbouring villages to not over burden Wellesbourne Village

Yes

Preferred Options 2025

Representation ID: 95603

Received: 04/03/2025

Respondent: Mr Ian Clarke

Representation Summary:

Development in this location is adjacent to pre-existing development and does not undermine green belt policy that has served the country well for many years. It is accessible to the M40.

No

Preferred Options 2025

Representation ID: 95690

Received: 11/02/2025

Respondent: Miles McGarty

Representation Summary:

I object strongly to the proposed housing development in Strategic Growth Area SG15 and surrounding sites near Wellesbourne. I believe these plans are disproportionate and detrimental to the community, infrastructure, and character of the area. Key issues include inadequate education and healthcare services, transport challenges, and the risk of overdevelopment harming Wellesbourne's identity and environment. The consultation process is complex and lacks transparency. I urge the council to reconsider these proposals and adopt a more sustainable approach that prioritises infrastructure and community needs. I look forward to your response.

No

Preferred Options 2025

Representation ID: 95771

Received: 04/03/2025

Respondent: Mr Peter Underwood

Representation Summary:

More houses here would overload the road infrastructure into Straford.

No

Preferred Options 2025

Representation ID: 95868

Received: 04/03/2025

Respondent: Mrs Barbara Licence

Representation Summary:

Object to more houses

No

Preferred Options 2025

Representation ID: 96013

Received: 04/03/2025

Respondent: Stephen Bolton

Representation Summary:

What is happening to 'The Forest of Arden' and 'Leafy Warwickshire'?
This sort of mass house building in rural Warwickshire is beyond any joke, it is making of small village communities into parts of NEW townships, So they lose ALL identity of their existing community spirit and life.
If SG15 were to go ahead this would finish up the linking up of the townships of Warwick, Leamington & Whitnash with the now large village Wellesbourne. This can not be right!
If this were allowed to go ahead, problems for our existing roads, wildlife, Doctors surgeries.
Please reconsider these consultation areas.

Yes

Preferred Options 2025

Representation ID: 96231

Received: 04/03/2025

Respondent: Mr James Pateman

Representation Summary:

Build housing on non-greenbelt land.

No

Preferred Options 2025

Representation ID: 96451

Received: 05/03/2025

Respondent: Mr John Waywell

Representation Summary:

Major infrastructure update required before more development. Improved waste water system flooding has already occured morehouses will cause pollution of the Stour and Avon.
Improved electricity supply blackouts have already happened.
Improved water supply loss has already occured
Local roads unsuitable for more traffic.
Medical services overburdened.

No

Preferred Options 2025

Representation ID: 96576

Received: 05/03/2025

Respondent: Mr Colin Stewart

Representation Summary:

Over development in this location will create excessive traffic along Tiddington Road, and through Stratford-upon-Avon across the Clopton Bridge, which is already over congested.
The airport should also be protected for future unknown aviation use during the life of this plan.

Other

Preferred Options 2025

Representation ID: 96758

Received: 05/03/2025

Respondent: Alcester Town Council

Representation Summary:

Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’) has no comment.

Yes

Preferred Options 2025

Representation ID: 96982

Received: 05/03/2025

Respondent: Mrs Margaret Jeffery

Representation Summary:

N/A

Yes

Preferred Options 2025

Representation ID: 97010

Received: 05/03/2025

Respondent: Spitfire Homes

Agent: JLL

Representation Summary:

Spitfire Homes agree with the inclusion of Strategic Growth Location SG16, and consider that land should be allocated in this location because: (a) Wellesbourne is one of the most sustainable locations for growth; (b) SG16 is ideally situated to support planned employment growth within the Core Opportunity Area, MIS.8 and MIS.9; (c) SG16 lies entirely outside the Green Belt and should therefore be prioritised; (d) SG16 continues the established patterns of growth south of Wellesbourne; (e) Wellesbourne Wood will contain and mitigate the impact of development; (f) The Sustainability Appraisal confirms that SG16 is more sustainable than SG15.

Yes

Preferred Options 2025

Representation ID: 97025

Received: 05/03/2025

Respondent: Mr

Representation Summary:

I can think of no reason why it should not be considered for inclusion.

Other

Preferred Options 2025

Representation ID: 97470

Received: 05/03/2025

Respondent: Liberal Democrat Group (Stratford District councillors)

Representation Summary:

Wellesbourne has taken significant development during the last Core Strategy and should be protected. If development is required it should be north of the river Dene and provide active travel facilities to village facilities and the school. Bridge Street is not suitable for pedestrian access to the main village. For the same reason housing development east of the A429 is not suitable. I shall make detailed comments on each site in Wellesbourne East and Rural in an attached document.

No

Preferred Options 2025

Representation ID: 97520

Received: 05/03/2025

Respondent: Dr Jill Andrews

Representation Summary:

Use of such 'infill' areas is just fudging the issue and detrimental to roads and facilities already at breaking point and beyond capacity - eg poor Clopton Bridge.

No

Preferred Options 2025

Representation ID: 97554

Received: 05/03/2025

Respondent: Mrs Marilyn Chalmers

Representation Summary:

There are few green areas as it is now. We are currently over our housing allocation by 200. We have a poor bus service, frequently not even turning up so how would people get to work. The buses take in excess of 30 minutes to reach their destinations. We already struggle with parking and poor roads. Historic local bridges would not take the strain of 1600 more cars, possibly more with 2 per household. There are problems with flooding now! Sewerage runs onto roads and gardens. Jobs are declining here rapidly. We are surrounded by flood plains for a reason!

No

Preferred Options 2025

Representation ID: 97601

Received: 05/03/2025

Respondent: Ms Anna Avino

Representation Summary:

Leamington has already exploded in the past five years. The roads are jammed, the services are overstretched and the vast housing developements and population explosion is changimg the character of the area and making it unpleasant. Infrastructure cannot cope with all the new 29,000 homes being concentrated in a few massive developments in the area particularly south Leamington and Whitnash which is gridlocked. These houses need to be fully dispersed across the whole of warwickshire with every town and village taking a handful of them. This woudl be a fairer, more sustainable appproach as the infratrusture wil alsways play catch-up.

No

Preferred Options 2025

Representation ID: 97689

Received: 05/03/2025

Respondent: Mr ALAN GEORGE

Representation Summary:

The airfield must be kept as an airfield. This is the only independent airfield within many miles of Warwickshire/West Mids and offers many business oppertunites. If housing was to replace this airfield it would also lead to congestion and other problems as there is no infrastructure or supported services to provide for the residents and their families.

No

Preferred Options 2025

Representation ID: 97734

Received: 05/03/2025

Respondent: Mrs Tracy Armstrong

Representation Summary:

Wellesbourne is full, Doctors are swamped, school full, dentist full. We do not need any more houses, we need to protect the green belt. There is nothing to support the new plans. Leave Wellesbourne alone

Yes

Preferred Options 2025

Representation ID: 97755

Received: 05/03/2025

Respondent: Mr Gary Jeffery

Representation Summary:

N/A

No

Preferred Options 2025

Representation ID: 98060

Received: 06/03/2025

Respondent: Mr Andrew Strang

Representation Summary:

To keep it brief, I am a resident of Wellesbourne for around 14 years, this new application raises serious concerns for me as it shows the destruction of our beloved airfield which has became a symbol to the village and draws people far and wide to the village, I am also worried about Wellesbourne's infrastructure as the roads are already quite bad around the village and thousands of new cars will only make this worse, as for public transport it is pretty much nonexistent in the village thus gridlocking us, I also fear for the local wildlife.