BASE HEADER
PO5: Affordable Housing
Gwrthwynebu
Preferred Options
ID sylw: 52228
Derbyniwyd: 27/07/2012
Ymatebydd: A Law
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52238
Derbyniwyd: 27/07/2012
Ymatebydd: Jon Waite
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52248
Derbyniwyd: 27/07/2012
Ymatebydd: Anna Waite
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52258
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Robert Cammidge
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52268
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Robert Cammidge
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52278
Derbyniwyd: 27/07/2012
Ymatebydd: Nick Jaffray
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52288
Derbyniwyd: 27/07/2012
Ymatebydd: Mr & Mrs P Harris
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52298
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Simon Primrose
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52308
Derbyniwyd: 27/07/2012
Ymatebydd: Mrs Anna Green
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52318
Derbyniwyd: 27/07/2012
Ymatebydd: mr malcolm henchley
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52328
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Adrian Hopkinson
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52338
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Michael Killeen
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52348
Derbyniwyd: 27/07/2012
Ymatebydd: Anne Joynson
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52358
Derbyniwyd: 27/07/2012
Ymatebydd: Matthew Sparkes
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52368
Derbyniwyd: 27/07/2012
Ymatebydd: E James
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52378
Derbyniwyd: 27/07/2012
Ymatebydd: Neil Patchett
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52388
Derbyniwyd: 27/07/2012
Ymatebydd: Angie Kenny
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52398
Derbyniwyd: 27/07/2012
Ymatebydd: Alex Mellon
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52408
Derbyniwyd: 27/07/2012
Ymatebydd: Isabel Jackson
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52418
Derbyniwyd: 27/07/2012
Ymatebydd: Mrs Julia Robins
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details:   
Gwrthwynebu
Preferred Options
ID sylw: 52428
Derbyniwyd: 27/07/2012
Ymatebydd: Darren Nicholas
Whilst we believe that we will need to have a limited amount of social rent a higher proportion should be shared ownership homes to try and give opportunities for those starting out on the housing ladder an opportunity to acquire a partial ownership in the village. Whilst we understand the motivation for WDC to state that they wish to retain the social units in perpetuity this will run counter to the requirements of lenders who do need to be able to exercise their rights in cases of extremis.
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012   
 New Local Plan Preferred Options   
Sheet 1 of 1    
Which document are you responding to?  Preferred Options (Full Version)   
Which part of the document are you responding to?  Preferred Option 1 (P01)   
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22   
What is the nature of your representation?  OBJECT   
Part 1 -Setting the Scene and Summary    
P01  - Preferred Level of Growth    
OBJECT    
It is agreed that some growth will be required during the 2014-2029 period to sustain an   
economic and vibrant economy. An increase in homes of appropriate tenures will be   
required but the level of growth based on the economic predictions certainly over the   
next five years seems excessive especially when viewed against the economic   
backdrop. This comment is supported by Office of National Statistics data which reveals   
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and   
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%   
from 0.8%. Predictions from the respected International Monetary Fund have revised   
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat   
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over   
stated.   
We believe that the demand for further housing in Norton Lindsey is limited and can be   
adequately met by windfall sites and as has been historically the case utilising previously   
used land and buildings.   
Changes to Preferred Option 1 -adopt a more conservative growth pattern to   
reflect market conditions which are likely to prevail over the first half of the Plan   
period.   
Definitions:   
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council   
Agent's contact details: